Structural Engineering

Zellstoff Pöls – Pipe Bridge PM2

Our client, Zellstoff Pöls AG, assigned us with the planning and static processing/execution of a pipe bridge with a total length of approx. 270 m. The pipe bridge is located on the company’s factory premises, between the existing pulp storage halls.

Details

Client: Zellstoff Pöls AG
Net Manufacturing Costs: € 2,5 Mio.
Planning Period: 2013
Execution Period: 2013

The bridge is a steel construction made of spatial truss girders and truss columns with different spans. The foundation as deep foundation (individual single foundations), was made using bored piles with approx. 6.0 m pile lengths. The lines were implemented with an inclined distortion along the workshops, including a road crossing. The development was carried out via terrain slopes, some of which were integrated into the existing pipe bridges.